The Weak Link helps protect pipe during installation. It is designed to yield before reaching the pipe’s standard safe pull strength to protect the pipe from overload. The Weak Link P20 is designed to yield at a force of approximately 20% less than normal tensile strength of PE pipe. It is available in both yellow medium density PE pipe and black high density PE pipe.
Each model clamps four pipe sizes without needing inserts, and secures PE pipe during the electrofusion process. Each model includes a two foot dovetail bar and two clamps.
The guards provide protection for meters, regulators, and areas prone to snow and ice build-up. The Meter & Regulator Ice Guards are available up to 20” wide. Customized guards are available.
The brackets are typically used to support large industrial meters or large multiple meter sets. All brackets are powder coated to ensure long life and maintenance free service. Custom sizes and options are available.
Each vise grip style clamp clamps one pipe size, and secures PE pipe during the electrofusion process. Standard jaw inside dimension - 4" for 1/2" CTS through 1" IPS, 4-3/7" for 1-1/4" IPS, and 4-7/8" for 2" IPS.